  • Minimum 32m deep truck court
  • Sufficient parking places for both cars and lorries
  • Fully 2.30m high fenced building court with barbered wire
  • 24 hours security
  • CCTV surveillance controlled from gate house
  • 10 lux external areas lighting level with Zumtobel LED lights
  • Retention pound

Warehouse

  • Concrete/steel building structure with an average 25m x 12m column spacing
  • High load-bearing concrete frame; thermal façade and roofing
  • Flexible units from 3,000 m2
  • 10m internal clear height
  • Min. 150 lux internal lighting level with Zumtobel LED lights. Higher lighting level in loading/unloading and technical areas
  • ESFR sprinkler system, FM Global approved
  • Interior fire hydrants
  • 5 t/m2 floor loading capacity – flatness corresponding to DIN 18202. Single layer jointless construction min. 2,000 m2
  • Electrical loading docks, drive-in doors and fire protection gates by Hörmann
  • Docks raised 1m above road
  • Facility management on site

Office

  • Two storey offices within the warehouse. Flexible layout with sufficient social areas.
  • Centralized heating system
  • In-wall mounted sanitary fixtures GEBERIT
  • A/C cooling system with LG split units
  • Average internal lighting level 500 lux with Zumtobel LED lights